GARANTI BANK TECHNOLOGY CAMPUS

  • Investor: T.R. GUARANTEE BANK
  • Period: 2010
  • Indoor Space: 130.000 m2
  • Installed Power: 1,6 mVA (şantiye)
  • Place: Pendik, İstanbul

Scope

• Field and Construction Site Electrical Infrastructure Works
• MV Underground Energy Transmission Line 0.1km 36kV
• 3 Cell Modular 36kV Distribution Center
• LV Underground Energy Transmission Line 2 km 0.4kV
• 1.6 mVA Transformer Center
• LV Distribution Systems IEC604391.2
• 0.4kV Cabling
• Environmental Lighting Works